Summary: Design work on a full scale plutonium production reactor began at the Met Lab in June 1942 Scientists at the Met Lab had the technical expertise to design a production pile but construction and management on an industrial scale required an outside contractor General Groves convinced the DuPont Corporation to become the primary contractor for
Image Dimensions: 706 x 380
Image originally found here.