Summary: costs etc Pavement design and produced the final design drawings were completed and contract documentation to allow the scheme to be priced by the Council s term contractor The contractor examined the Traffic Management requirements and these were discussed with the Client It was agreed that a temporary traffic order was required to control vehicle